PLC programming, an hour up the road.
We are based in Centerville, which puts most of the Wasatch Front within an easy drive. For Utah manufacturers that means on site work without travel days on the invoice.
Utah has a dense manufacturing corridor running from Ogden to Provo, and a great deal of it runs on control systems that were installed a decade or more ago and modified since by whoever was available. Our Utah PLC work is split roughly evenly between new programs and untangling that history.
We program Allen-Bradley ControlLogix and CompactLogix, Siemens S7-1200 and S7-1500, Opto 22 groov EPIC and SNAP PAC, and Wago PFC controllers. Being close by matters most for commissioning and for the small changes that are not worth a flight but are worth an afternoon.
Every program we deliver comes with unlocked source, a documented tag database and a sequence of operations written in plain language, so your maintenance team is not dependent on us for the next change.
Utah coverage
- Salt Lake City, Ogden, Provo, Layton, Logan and West Valley City
- Based in Centerville, typically next day on site along the Wasatch Front
- Food processing, water and wastewater, manufacturing and OEM equipment
- Remote support same business day for most issues
- Unlocked source code and documentation on every project
What this involves.
New programs
Machine and process control written from specification or from a conversation with the people who run the equipment.
Upgrades & migrations
Moving off SLC 500, PLC-5 and S7-300 hardware without losing process knowledge embedded in the old code.
Logic changes
Surgical changes to running systems, tested and documented, with a defined rollback position.
Answers before you call.
Along the Wasatch Front, usually next day and sometimes same day. We are in Centerville, so Salt Lake City, Ogden, Layton and Provo are all short drives.
For work along the Wasatch Front, travel is generally not a separate line item. For southern Utah or remote sites we will state it clearly in the quote rather than surprising you.
Yes, and it is most of what we do. We will want to read it before quoting, because the state of an existing program is the biggest single factor in how long a change takes.
Need a PLC program changed this week?
Call (801) 946-2710. If it is small, we will often tell you how to do it yourself.
Or call (801) 946-2710, Monday, Friday, 8:00am, 4:30pm MT